Read the Heat-Welding Guide
Continue to the relevant August Flooring resource for product comparison, project preparation or supplier review.
Open resource →Installation Planning Guide
Good installation planning begins before the roll is opened. Confirm the approved flooring construction, substrate condition, layout, adhesive guidance, seam method, welding-rod compatibility and site requirements with the project installer.
Before installation, verify the delivered model and approved sample, inspect and prepare the substrate, dry-plan sheet direction and seams, and confirm the compatible adhesive and welding method. Follow the flooring, adhesive and vehicle project instructions; this checklist does not replace a qualified installer or project specification.
Flooring performance depends on the complete installation system. The flooring, backing, substrate, adhesive, seam detail and working conditions should be reviewed together.
| Preparation area | What to confirm | Project record |
|---|---|---|
| Delivered material | Model, color, backing, roll labels and condition against the approved order. | Receiving check and roll allocation. |
| Substrate | Material, flatness, cleanliness, dryness and readiness under the project specification. | Inspection result and required corrective work. |
| Layout | Sheet direction, cut map, transitions, edges and permitted seam locations. | Approved installation drawing. |
| Adhesive system | Compatibility and application guidance from the selected adhesive and flooring instructions. | Product reference and installer method statement. |
| Seams and accessories | Groove and welding approach, compatible rod profile, color and finishing detail. | Seam sample and accessory list. |
| Site conditions | Working conditions and conditioning requirements specified by the project and material suppliers. | Site log and installer acceptance. |
Resolve unclear items before cutting or bonding the flooring. Keep the approved sample and installation drawing available to the site team.
Continue to the relevant August Flooring resource for product comparison, project preparation or supplier review.
Open resource →Continue to the relevant August Flooring resource for product comparison, project preparation or supplier review.
Open resource →Continue to the relevant August Flooring resource for product comparison, project preparation or supplier review.
Open resource →No. Follow the selected flooring, adhesive, vehicle project and installer instructions. Use this page only to organize the information that should be confirmed.
Approve sheet direction, cuts, transitions and seam locations before material is cut or bonded.
Provide the flooring model, seam detail, required profile and color so compatibility can be reviewed before installation.
Use the project inspection plan to review bonding, seams, edges, transitions, surface condition and protection before handover.
Prepared by August Flooring to help purchasing, engineering and installation teams organize supplier discussions. Final product selection, construction, performance and installation must follow the vehicle project specification, approved sample and qualified installer guidance.
Send the vehicle application, model or color reference, drawing or installation requirement, quantity and destination. The August Flooring team will review suitable products, samples and quotation details.